What is Production Part Approval Process (PPAP)?

The PPAP process, or production part approval process, is how an automotive supplier proves to the customer 
that it can make a part to spec, consistently, before mass production. It’s a package of evidence, not a single 
test. People pair it with APQP, but APQP is the planning journey; PPAP is the approval it produces near the end. 

Why is the PPAP important?

The PPAP process gives the customer documented proof that a supplier can make a part to specification before mass production starts, which heads off defective parts and costly launch delays. In the automotive supply chain it is a requirement under IATF 16949, so a missing or incomplete submission can hold up an entire program. Getting the production part approval process right the first time protects both quality and the supplier relationship.

What goes into a PPAP submission?

A full PPAP pulls together the evidence that a part and its process are production-ready: 
  • Process flow, design and process FMEAs, and a control plan.
  • Measurement system analysis and capability studies proving the process is stable.
  • A part submission warrant (PSW), the cover sheet that signs it off.
  • Whatever else the customer’s submission level demands, from a warrant only to the full file. 

How does the PPAP Process differ from APQP?

Package versus journey. Advanced product quality planning (APQP) is the whole five-phase plan from 
concept to launch. PPAP is the evidence bundle produced in the validation phase, the one that gets the part 
approved. APQP plans quality in; PPAP proves it’s there. Both live under IATF 16949. 

PPAP vs APQP vs FAI at a glance

Three automotive quality steps, sorted by what they prove. 
 
AspectPPAPAPQPFAI
What it isAn approval packageA five-phase planA first-part check
ProvesThe process is production-readyQuality was planned inOne part meets the drawing
ScopeSystem-level evidenceConcept to launchPart-level
WhenValidation phaseThe whole programInside PPAP, or standalone

Related Terms

 

Further Reading

  • EQMS – elctronival quality management system

Assembling PPAP packages across folders and email?
Digitize inspections, evidence, and sign-offs in one place.

Screenshot of flowdit application