Business Category: Operations / Industrial Category: Property & Facilities Management

Check List Apagones SD - OP

Offices and SD islands

Use this template with flowdit

  • Customize this template or build your own
  • Complete inspections using the mobile app
  • Get reports and analyze your data

Start inspecting smarter — free for one user.

Check List Apagones SD - OP
Based on

How to Use This Checklist

  • Record the inspection date, the person preparing it, and the location.
  • For each item under Equipment to Inspect, verify that the unit is correctly switched off and select the status that applies. The answer scale is Off, On, Unplugged, or Not Applicable.
  • Work through all listed equipment, including motors, appliances, televisions, turnstiles, network devices, printers, monitors and NUCs, the paper shredder, lamps, fans, and air units.
  • Enter the inspection's real start and end dates and add your signature.

Start inspecting smarter — free for one user.

What this power outage inspection covers

The checklist covers 29 items across two sections: **Equipment to Inspect** and **Equipment Status**. Its purpose is to confirm that equipment in offices and SD islands is properly shut down during a power outage — that each unit is switched off and its actual state is recorded. Rather than a simple pass or fail, each item is answered on a four-value scale: - **Off** - **On** - **Unplugged** - **Not Applicable** This lets you capture the real condition of every unit, not just whether someone looked at it.

Why it matters

A power outage is exactly when equipment is most exposed. Motors, appliances, and network devices that are left powered or connected can be affected when supply returns, and a written record of what was off, unplugged, or genuinely not applicable gives you a clear account afterward. The checklist also prompts you to **verify correctly that all listed equipment is switched off**, so the inspection is deliberate rather than a quick glance — and the recorded start and end dates and signature make the result traceable.

What a good power outage inspection covers

A complete round should account for every powered or connected item in the area, and this checklist does that across categories: - **Building and utility equipment:** water plant motor, water dispenser, water purifier, air purifier, ozone dispensers, air central unit, split air unit. - **Office appliances:** coffee maker, microwave. - **Screens and displays:** advertising televisions (large screen), advertising signs, Huawei meeting televisions in coworkings and offices, camera television. - **Access and network devices:** turnstile NUC, turnstile TV, Datafast, monitors and NUCs. - **General office equipment and fittings:** printers (unplugged), paper shredder, lamps, fans in restrooms and offices. A thorough inspection also records whom the check was prepared by, where it took place, and when it actually started and finished.

How to carry out the inspection

1. Start by recording **conducted on, prepared by, and location** so the round is attributable. 2. Move through each area and, for every item under **Equipment to Inspect**, confirm the unit is correctly switched off and select the status that applies — **Off, On, Unplugged, or Not Applicable**. 3. Treat each item individually. Devices that should be unplugged, such as printers, are listed separately from those that should simply be off, such as monitors and NUCs. 4. Where an item does not exist in the area you are checking, mark it **Not Applicable** rather than leaving it blank. 5. Close out by entering the **inspection real start date**, **inspection real end date**, and your **signature**. > Use the checklist as the working record for the round: it prompts the steps, holds the status of each unit, and keeps the completed inspection on file for later reference.

Frequently Asked Questions

The inspection covers 29 items across two sections: Equipment to Inspect and Equipment Status. It lists water plant motor, coffee maker, microwave, water dispenser, water purifier, air purifier, advertising televisions (large screen), advertising signs, ozone dispensers, turnstile NUC, turnstile TV, Huawei meeting televisions in coworkings and offices, camera television, Datafast, printers, monitors and NUCs, paper shredder, lamps, fans in restrooms and offices, air central unit, and split air unit. Each item is checked against the status that applies to it.

Record the date the inspection is conducted, who prepared it, and the location. Then go through each listed unit and select the status that applies to it — Off, On, Unplugged, or Not Applicable — and confirm that all equipment is correctly switched off. Close by recording the inspection's real start and end dates and a signature.

The answer scale used for each unit is Off, On, Unplugged, or Not Applicable, so you can record the actual state of every item rather than a simple pass or fail.

The inspection is intended for offices and SD islands, and it includes items found in both, such as printers that should be unplugged, monitors and NUCs that should be off, and fans and lighting in restrooms and offices.
Arne Reis
Written by
Arne Reis
Founder

Process optimizer with 25 years of expertise, focused on operational excellence in quality, maintenance, EHS, and commissioning. Emphasizes innovative solutions and top-quality standards.

View LinkedIn profile

Still managing operations with paper and Excel?

Digitize inspections, audits, SOPs, and corrective actions.

Book A Personal Demo
flowdit mobile inspection app

Ready to simplify inspections and get your team moving faster?

Start free today and turn inspections into a clear, consistent digital workflow. Prefer a guided walkthrough? Book a demo and see how flowdit can fit your team.