Pre-Entry Construction Site Safety Check (3T SHE)

Use this 3T SHE pre-entry checklist to perform a comprehensive visual inspection of a construction site before gaining access, ensuring all Safety, Health, and Environment controls are verified and in place. Assess sign-in procedures, escort availability, emergency contacts, and site access permissions. Evaluate ground-level and overhead hazards including trenches, excavations, power lines, and roofing structures. Confirm safe work proximity, 3-metre mobile plant exclusion zones, scaffolding compliance, mutual control measures, mandatory PPE, evacuation and first aid readiness, and white card certification. Document findings with photos, assign corrective actions where needed, and export a detailed compliance report.

Use this template with flowdit

  • Customize this template or build your own
  • Complete inspections using the mobile app
  • Get reports and analyze your data

Start inspecting smarter — free for one user.

Pre-Entry Construction Site Safety Check (3T SHE)
Based on

How to Use This Checklist

  • Confirm the nature of the visit and note the site, date, time and who prepared the inspection.
  • Check whether you can safely sign in at the designated entry point, and have the site contact's phone number to hand.
  • Record the name and mobile number of your escort or designated contact, and confirm you have explicit permission to access the site if no escort is available, along with who authorised it.
  • Inspect ground-level hazards for open trenches, debris, excavations, gates and guard dogs, and check for overhead activities such as power lines, multi-storey structures, trees, roofing frameworks, plumbing and downpipes.
  • Assess whether nearby activities are being conducted safely, including roofing work, equipment usage and work involving water, gas, chemicals and power tools.
  • Confirm the 3-metre mobile plant exclusion zone is respected around forklifts, cranes and other plant, and that scaffolding, balustrades, stairs and temporary structures look compliant and structurally safe.
  • Verify controls in both directions: measures preventing your actions from affecting others, and measures protecting you from others' actions.
  • Confirm your PPE is appropriate for every designated site area and that your valid GIT card (General Construction Induction / White Card) is in your possession.
  • Locate the evacuation assembly points and first aid stations, and check they are clearly identified and accessible.
  • If the site is unsafe and the hazard cannot be rectified immediately, confirm whether a formal Job Safety & Environmental Analysis (JSEA) has been completed.
  • Record additional observations, identified hazards, corrective actions, an overall pre-entry safety rating and the approximate temperature, then close out the inspection with a signature and completion time.

Start inspecting smarter — free for one user.

What this inspection covers

Before you step onto a construction site, three things need to be true: you are expected and authorised to be there, the route in and the ground you will cross are safe, and the work going on around you will not put you in harm's way. A pre-entry safety check is the short, structured inspection that establishes those three things before access is granted. This 3T SHE pre-entry checklist walks you through a visual inspection of the site from outside or at the boundary, then through the access and sign-in controls at the entry point. It covers site access permissions, escort and emergency contact details, ground-level and overhead hazards, safe work proximity, mobile plant exclusion zones, scaffolding and temporary structures, mutual control measures, mandatory PPE, evacuation and first aid readiness, and White Card certification. It runs to 29 items and closes with a documented pre-entry safety rating.

Why it matters

Construction sites change hour by hour. A path that was clear yesterday may be an open excavation today, and a roof that was finished last week may now be an overhead activity dropping material into your route. Pre-entry inspection exists because the hazards you meet on the way in are not the same as the hazards a site worker has been managing all shift — you are arriving cold, without the local knowledge the regular crew has built up. The checklist treats a valid GIT card (General Construction Induction / White Card) and compliant PPE as conditions of entry rather than preferences. It also asks you to confirm an escort or explicit permission, and to check that you can sign in safely at the designated point, so that someone on site knows you are there and where you are.

Safety, Health and Environment controls to verify

**Ground-level hazards.** Inspect the route you will take and the area immediately around it for open trenches, debris, excavations, gates and guard dogs, and confirm that obstacles are clearly visible and avoidable. **Overhead activity.** Look up as well as down. Check for power lines, multi-storey structures, trees, roofing frameworks, plumbing and downpipes that could present a falling-object or contact risk. **Activities in your vicinity.** Assess roofing work, equipment usage and any exposure to water, gas, chemicals and power tools, and decide whether the work around you is being conducted safely. **Mobile plant.** The 3-metre mobile plant exclusion zone is a defined boundary. Observe forklifts, cranes and any other mobile plant operations to confirm the zone is being respected. **Temporary structures.** Check that scaffolding, balustrades, stairs and temporary structures appear compliant and structurally safe.

Mutual control measures

Site safety is not only about what you avoid — it is also about what you introduce. The checklist asks you to verify controls in both directions: - **Controls preventing your actions from affecting others**, considering parking, visit announcements and correct handling of hazardous chemicals. - **Controls protecting you from others' actions**, verifying access points, visitor sign-in and sign-out registers, barricades and safety signage. If the site is assessed as unsafe for entry and the hazard cannot be rectified immediately, the checklist asks whether a formal Job Safety & Environmental Analysis (JSEA) has been completed before proceeding.

Emergency readiness and completion

Before you enter, locate and confirm the designated evacuation assembly points and first aid stations — that they are clearly identified and accessible. Entry is prohibited without compliant PPE for all designated site areas and without your valid GIT card in your possession. At the close of the inspection, document any additional observations, identified hazards or corrective actions, assign an overall pre-entry safety rating, note the approximate temperature at the time of inspection, and sign off with the completion time. Findings can be recorded with photos and corrective actions assigned where needed, producing a detailed compliance report for the visit.

Frequently Asked Questions

You use it at two points. The first is before entry, when you inspect the site from outside or at the boundary — checking ground-level hazards such as trenches, debris and excavations, and overhead hazards such as power lines, multi-storey structures and roofing frameworks. The second is at the point of access, when you verify the sign-in procedure, your site contact, escort arrangements and the permissions that allow you onto the site.

The checklist treats a compliant GIT card (General Construction Induction card, also called a White Card) as a condition of entry, and states plainly that entry is prohibited without it. What that card demonstrates is general construction induction training, and it does not replace the site-specific checks this inspection covers.

A 3-metre exclusion zone is maintained around mobile plant. On entry you observe whether forklifts, cranes and any other mobile plant operations are keeping to that distance, so that you are not standing within the operating radius of moving plant.

The checklist seeks evidence of controls in both directions. Controls to prevent your actions from affecting others include parking, visit announcements and correct handling of hazardous chemicals. Controls to protect you from others' actions include access points, visitor sign-in and sign-out registers, barricades and safety signage.

Entry is prohibited without compliant PPE for all designated site areas. If the site is assessed as unsafe and the hazard cannot be rectified immediately, the checklist asks whether a formal Job Safety & Environmental Analysis (JSEA) has been completed before any entry proceeds.
Arne Reis
Written by
Arne Reis
Founder

Process optimizer with 25 years of expertise, focused on operational excellence in quality, maintenance, EHS, and commissioning. Emphasizes innovative solutions and top-quality standards.

View LinkedIn profile

Still managing operations with paper and Excel?

Digitize inspections, audits, SOPs, and corrective actions.

Book A Personal Demo
flowdit mobile inspection app

Ready to simplify inspections and get your team moving faster?

Start free today and turn inspections into a clear, consistent digital workflow. Prefer a guided walkthrough? Book a demo and see how flowdit can fit your team.