Ventilation System Inspection

The ventilation checklist enables facility teams to assess the performance and operation of ventilation systems.

Use this template with flowdit

  • Customize this template or build your own
  • Complete inspections using the mobile app
  • Get reports and analyze your data

Start inspecting smarter — free for one user.

Ventilation System Inspection
Based on

How to Use This Checklist

  • Record general details including the date, the person conducting the inspection, and the location.
  • Verify that the ventilation system was installed in accordance with the manufacturer's requirements and that relevant installation clauses were complied with.
  • Document the type of ducting installed (e.g. rigid or semi-rigid) and the description and position of the controls, such as timer, central control, humidistat, or PIR.
  • Note the total number of ventilation systems installed in the dwelling and the total floor area.
  • Check that the total installed equivalent fan area meets the requirements and that all background ventilators are left open.
  • Verify that the exact number and position of extract fans or terminals satisfy NF EN 12599 and that the correct number and size of ventilation systems are provided.
  • Confirm that the installation is complete, free from obvious defects, and that all internal doors have sufficient undercuts (at least 10 mm above the floor finish) to allow air transfer.
  • Ensure all protections and packaging have been removed so the system is fully functional.
  • For ducted systems, check that ductwork was installed to minimise resistance and air leakage.
  • Verify sufficient access for routine maintenance and for repair or replacement of components.
  • Check that appropriate air terminals are installed to allow the system to be balanced.
  • Confirm that the heat recovery unit and all ducts are effectively insulated where installed in unheated spaces.
  • Ensure the condensate connection is complete and discharges to an appropriate location.
  • During initial commissioning, check for abnormal noises, vibrations, or unusual odours.
  • Verify that the installation follows the design and that any variations have been agreed.
  • Check that controls were set up in accordance with the manufacturer's recommendations.
  • Ensure all distribution grilles are locked to prevent unauthorised adjustment.
  • Confirm that all equipment is in good working order.
  • Record the signature and the inspection start and end dates.

Start inspecting smarter — free for one user.

What is a ventilation system verification?

A ventilation system verification is a structured inspection of the performance and operation of ventilation systems, typically in dwellings. It is used to confirm that the system has been installed correctly, that it functions as designed, and that it is safe and ready for use. The checklist is organised into sections including Inspection, General, Visual inspections, and Air flow measurement test, and it contains 32 items.

Why ventilation system verification matters

Proper ventilation is essential for indoor air quality, moisture control, and occupant health. Verifying the installation and performance of ventilation systems helps to ensure that air is effectively extracted and supplied, that energy is not wasted through leakage or poor insulation, and that the system complies with relevant requirements. The checklist references NF EN 12599, a European standard for ventilation systems, which sets out requirements for the number, size, and positioning of extract fans and terminals. By following this checklist, you can confirm that the installation meets these standards and functions correctly.

What a good ventilation system verification covers

A thorough verification covers the following: - Installation compliance: Checking that the ventilation system was installed in accordance with the manufacturer's requirements and that relevant installation clauses were complied with. - Ducting and controls: Documenting the type of ducting installed (e.g. rigid or semi-rigid). Describing and locating the controls installed (e.g. timer, central control, humidistat, PIR, or manual/override controls). - System details: Recording the total number of ventilation systems installed in the dwelling and the total floor area. Confirming that the total installed equivalent fan area meets the requirements. - Visual inspections: Confirming that all background ventilators are in the open position. Verifying that the exact number and position of extract fans or terminals satisfy NF EN 12599. Ensuring the installation is complete and free from obvious defects. Checking that all internal doors have sufficient undercuts (at least 10 mm above the floor finish) to allow air transfer. Ensuring all protections and packaging have been removed. For ducted systems, checking that ductwork was installed to minimise resistance and air leakage. Verifying that the correct number and size of ventilation systems are provided and compliant with NF EN 12599. Ensuring sufficient access for routine maintenance and for repair or replacement of components. Confirming that appropriate air terminals are installed to allow balancing. Checking that the heat recovery unit and all ducts are effectively insulated in unheated spaces. Ensuring the condensate connection is complete and discharges to an appropriate location. - Commissioning: During initial commissioning, checking for abnormal noises, vibrations, or unusual odours. Verifying that the installation follows the design and that any variations have been agreed. Confirming that controls were set up in accordance with the manufacturer's recommendations. Ensuring all distribution grilles are locked to prevent unauthorised adjustment. Confirming that all equipment is in good working order.

How to carry out a ventilation system verification

You can carry out the verification using this checklist as a guide: 1. Record general information, including the date, the person conducting the inspection, and the location. 2. Inspect the installation against the manufacturer's requirements and relevant installation clauses. 3. Document the ducting type and controls, including their position and description. 4. Measure and record the total number of ventilation systems and the total floor area. 5. Check that the total installed equivalent fan area meets the requirements and that background ventilators are left open. 6. Verify the number and position of extract fans or terminals against NF EN 12599 and confirm the correct number and size of systems. 7. Conduct visual inspections to confirm completeness, absence of defects, door undercuts, removal of packaging, ductwork installation, access for maintenance, air terminals, insulation, and condensate discharge. 8. During commissioning, listen and look for abnormal noises, vibrations, or odours, and confirm that the installation follows the design with agreed variations. 9. Check that controls are set up per the manufacturer's recommendations, that distribution grilles are locked, and that all equipment is in good working order. 10. Record the signature and inspection start and end dates.

Frequently Asked Questions

This checklist covers the installation and inspection of ventilation systems in dwellings, including installation compliance, ducting and controls, air flow measurement tests, visual inspections, and commissioning checks.

A good ventilation inspection verifies that the system was installed in accordance with the manufacturer's requirements, that the ductwork minimises resistance and air leakage, that the correct number and size of systems are provided in conformity with NF EN 12599, and that air terminals allow the system to be balanced.

The checklist includes visual inspections and air flow measurement tests. Visual inspections check that the installation is complete, free from obvious defects, and that internal door undercuts and background ventilators are correct. The air flow measurement test confirms that the total installed equivalent fan area meets the requirements.

NF EN 12599 is a European standard referenced in the checklist for ensuring the correct number, size, and positioning of extract fans and terminals. You should verify that the installation complies with the relevant clauses of this standard.

You should verify that the system was installed according to the manufacturer's requirements and recommendations, including the setup of controls, and that any variations from the design have been agreed.

You need to confirm that all protections or packaging have been removed, that the heat recovery unit and ducts in unheated spaces are insulated, that the condensate connection discharges appropriately, and that there are no abnormal noises, vibrations, or odours during initial commissioning.
Arne Reis
Written by
Arne Reis
Founder

Process optimizer with 25 years of expertise, focused on operational excellence in quality, maintenance, EHS, and commissioning. Emphasizes innovative solutions and top-quality standards.

View LinkedIn profile

Still managing operations with paper and Excel?

Digitize inspections, audits, SOPs, and corrective actions.

Book A Personal Demo
flowdit mobile inspection app

Ready to simplify inspections and get your team moving faster?

Start free today and turn inspections into a clear, consistent digital workflow. Prefer a guided walkthrough? Book a demo and see how flowdit can fit your team.