Site Acceptance Test Checklist
This Site Acceptance Test (SAT) checklist provides a structured framework for validating the operational reliability and integration of newly manufactured equipment within its final installed environment. Following the completion of the factory acceptance test, equipment delivery, and on-site installation, this checklist guides the client—ideally in collaboration with the manufacturer's quality assurance representative—through a comprehensive series of verification procedures. Systematically complete each assessment step to document acceptance outcomes, identify any deviations, and produce a detailed, shareable SAT completion report upon conclusion.
Use this template with flowdit
- Customize this template or build your own
- Complete inspections using the mobile app
- Get reports and analyze your data
Start inspecting smarter — free for one user.
How to Use This Checklist
- Conduct the test on the date recorded, and note who prepared the checklist, the location, and the equipment identification number or serial code.
- Where applicable, carry out the checks in collaboration with the manufacturer's quality assurance representative.
- Work through each verification step systematically, recording an assessment as Pass, Fail, Pass with Observations, or N/A, along with any deviations and the corrective actions required.
- Record the real inspection start and end dates and sign the checklist to produce a detailed, shareable SAT completion report.
Start inspecting smarter — free for one user.
Site Acceptance Test Inspection
A Site Acceptance Test (SAT) verifies that newly manufactured equipment operates reliably and integrates correctly within its final installed environment. It follows the factory acceptance test (FAT), equipment delivery, and on-site installation. Carry out the test on the recorded date, ideally in collaboration with the manufacturer's quality assurance representative, and document the equipment identification number or serial code, the location, and who prepared the checklist. The inspection covers: - **Exterior finishing and surface quality** — a visual inspection of the equipment's external condition. - **Primary mechanical and electrical components** — visual verification that these components are present and correctly installed. - **Internal enclosure pressure and ventilation system configuration** — a check of how the enclosure is set up. - **Utility systems** — verification of functional performance and configuration. - **Mechanical and software interlocks** — verification that interlocks function correctly. - **Hot test operational verification** for dispensing systems. - **Dose calibrator measured output value**, recorded in the applicable units. - **Safety devices and protective interlocks** — verification that these are in place and working. - **Operator training completion and competency** — confirmation that operators are trained and competent to run the equipment. Each assessed item is rated as **Pass**, **Fail**, **Pass with Observations**, or **N/A**. Record any additional observations, deviations, or corrective actions required, and give an overall **site acceptance readiness rating**. > Systematic completion of each assessment step documents acceptance outcomes and identifies deviations, producing a detailed, shareable SAT completion report.
Site Acceptance Test (SAT) Procedure
The full checklist contains 20 questions across two sections, beginning with the Site Acceptance Test Inspection above and followed by the procedure below. The procedure covers the same verification areas — exterior finishing and surface quality, primary mechanical and electrical components, internal enclosure pressure and ventilation, utility systems, mechanical and software interlocks, hot test operational verification for dispensing systems, the dose calibrator measured output value, safety devices and protective interlocks, and operator training completion and competency — with each item rated on the Pass / Fail / Pass with Observations / N/A scale. Beyond the individual assessments, record: - Confirmation that the **FAT protocol documentation and handover package** have been delivered. - The **overall site acceptance readiness rating**. - **Additional observations, deviations, or corrective actions** required. - The **inspection real start date** and **inspection real end date**. - **Signature** and completion details. Where a regulation or standard applies to the equipment or site, name and reference it directly rather than relying on this checklist alone. Complete each step in sequence and retain the signed checklist as your SAT completion record.