Workplace Building Preventive Maintenance Checklist
Use this building maintenance checklist during scheduled inspections of lighting, electrical systems, safety, HVAC, plumbing and the interior and exterior of the workplace building. Spot issues and assign tasks immediately to the right team or staff member, even while your maintenance inspection is in progress, and receive status updates.
Use this template with flowdit
- Customize this template or build your own
- Complete inspections using the mobile app
- Get reports and analyze your data
Start inspecting smarter — free for one user.
How to Use This Checklist
- Walk the building and answer each item as you inspect it. The review is organised by system, so you can move from lighting and electrical through safety, HVAC, interior, exterior, and plumbing in sequence.
- Test and confirm that interior, exterior, and exit lights are correctly installed and working, that timers and photocells function correctly, and that cover plates are free of cracks and tightly secured.
- Check that electrical hardware and connections are in good condition and that controls and equipment have been tested and are safe.
- Review safety equipment: first aid kits restocked, eyewash bottles and stations reviewed, safety signs and equipment labels in good condition, respirators inspected and cleaned, and harnesses and fall protection kits inspected.
- Confirm that smoke and carbon monoxide detectors and the fire alarm system have been tested and are working, that fire fighting equipment is in good condition, and that all doors are in good working order with exits unobstructed. Door locks and closures must be in good condition and work areas and aisles properly marked.
- For HVAC, clean the air intake as necessary, change air filters as necessary, and confirm running fan motors show no excessive noise or vibration. Clean motors and ducts as necessary and confirm the condensate drain pan drains adequately. Review flexible duct connectors and confirm guards and panels are secured and not loose.
- For the indoor and outdoor units, confirm correct operation, inspect the condenser air inlet, discharge, and coil, and check that refrigerant piping and insulation are in good condition and that guards or access panels are secured and not loose.
- Inspect compressed air lines regularly for leaks in pipes, tubes, or fittings, replace or clean air filter elements at least quarterly or as needed depending on the application, and monitor oil levels in air compressor pumps and replace as needed depending on usage.
- For the building interior, confirm floors, ceilings, and walls show no evidence of deterioration and that there are no visible signs of leaks. Inspect the area for hazards, and record any observations, findings, or comments for the building interior.
- Check plumbing fixtures: faucets, toilets, and showers must be operational and in good working condition.
- For the building exterior, confirm there are no broken windows or doors, that fences and rails are in good condition, and that no plants are growing on the building or its foundations.
- Clean the roof as necessary, clean roof drains and gutters as necessary, and test drains and downspouts by pouring water through them. Confirm the roof is in good condition, that gutters are adequately anchored and adjusted if necessary, that the chimney and all roof penetrations have been inspected, and that no plant life is growing on the roof.
- Where you find an issue, assign the task immediately to the appropriate team or staff member while the review is still in progress, and track its status.
Start inspecting smarter — free for one user.
What this checklist is and why it matters
Preventive maintenance of a workplace building is the scheduled review of the systems that keep a facility safe, comfortable, and working. This checklist supports that work by taking you through the lighting, electrical system, safety arrangements, HVAC, building interior, building exterior, and plumbing in a single pass. It is built for the person carrying out the inspection, so every item is something you can see, test, or confirm on site. The value of running a scheduled inspection is that it lets you find problems before they turn into failures, outages, or hazards. The checklist asks you to confirm that lights and exit lights are working, that alarms and detectors have been tested, that fire fighting equipment is in good condition, that exits and doors are unobstructed, and that no hazards are present. It also asks you to check that HVAC motors are not making excessive noise or vibration, that ducts and air intakes are clean, that drains flow, and that refrigerant piping and insulation are sound. Roof drains, gutters, downspouts, and the roof itself are all covered, along with walls, windows, doors, and fences.
The seven areas of the inspection
- **Lighting**: confirm that all lights, bulbs, and lamps have been checked and none require replacement; check luminaires with transformers, control equipment, or accessories such as drop lenses, glare baffles, or colour filters; verify that interior, exterior, and exit lights are correctly installed and working; confirm timers and photocells function correctly; check that cover plates are free of cracks and tightly secured; change batteries in smoke and carbon monoxide detectors, flashlights, and test instruments; and check that exhaust fans are clean. - **Electrical system**: confirm all electrical hardware and connections are in good condition, and that controls and equipment have been tested and are safe. - **Safety**: review and restock first aid kits; review eyewash bottles and stations; check safety signs and equipment labels; inspect and clean respirators; inspect harnesses and fall protection kits; confirm there are no electrical, mechanical, structural, physical, or trip hazards; test smoke and carbon monoxide detectors and the fire alarm system; confirm fire fighting equipment is in good condition; check that doors are in good working order and exits unobstructed; check door locks and closures; confirm work areas and aisles are properly marked; check for trash accumulation in storage areas; check for insect infestation; check cart wheels and shelf labelling, organization, and security; and check paint and walls. - **HVAC**: clean the air intake as necessary; change air filters as necessary; check that running fan motors show no excessive noise or vibration; clean motors and ducts as necessary; confirm the condensate drain pan drains adequately; review flexible duct connectors; and check that guards and panels are secured and not loose. Confirm the indoor unit is functioning correctly, that condenser fan motor bearings show no excessive noise or vibration, that the condenser air inlet, discharge, and coil have been inspected, that refrigerant piping and insulation are in good condition, that guards or access panels are secured, and that the outdoor unit is operating correctly. Inspect compressed air lines for leaks, replace or clean air filter elements at least quarterly or as needed, and monitor and replace oil levels in air compressor pumps as needed. - **Building interior**: confirm floors, ceilings, and walls show no evidence of deterioration; confirm there are no visible signs of leaks; and confirm the area has been inspected with no hazards found. There is space to record observations, findings, or comments. - **Building exterior**: confirm there are no broken windows or doors, that fences and rails are in good condition, and that no plants are growing on the building or its foundations. Clean the roof and clean roof drains and gutters as necessary; test drains and downspouts by pouring water through them; confirm the roof is in good condition; check that gutters are adequately anchored and adjusted if necessary; inspect the chimney and all roof penetrations; and remove any plant life growing on the roof. - **Plumbing**: confirm that faucets, toilets, and showers are operational and in good working condition.
Working through the inspection
Begin by recording the date, who prepared the inspection, and the location. Then take the systems in order, testing and confirming each item as you reach it rather than working from memory later. Most items are answered "Yes," "No," or "N/A," which keeps the record consistent from one inspection to the next. Because the review runs system by system, it is suited to being carried out with the task status kept up to date as you go. When an item fails, you can record it, assign the task to the appropriate team or staff member while the review is still in progress, and follow its status through to completion. That way the inspection produces both a record of the building's condition and an immediate list of work to be done.