Pump Maintenance Guide Template

A pump maintenance checklist is a tool used by technicians or engineers when inspecting pumps. Pump maintenance checklists guide inspectors through the inspection to help make sure the pumps are in good working order. Inspectors can use a digital checklist to help prevent unplanned disruptions by inspecting pumping stations.

Use this template with flowdit

  • Customize this template or build your own
  • Complete inspections using the mobile app
  • Get reports and analyze your data

Start inspecting smarter — free for one user.

Pump Maintenance Guide Template
Based on

How to Use This Checklist

  • **Prepare for the inspection.** Review the approved design, specifications, and any previous reports. Confirm that the site is accessible and that you have the required tools, including a thickness gauge for the control panel enclosure.
  • **Inspect the site and grounds.** Walk the area around the pump station and check the asphalt slope for drainage with no standing water. Inspect the grounds and paving, the fences and gates, the gate's full opening, and the fence posts and fabric for the correct vinyl coating.
  • **Inspect the pump well.** Check the interior lining and exterior coal tar epoxy coating for cracks, blisters, detached materials, or exposed concrete. Confirm that stainless steel bolts are used in the ductile iron piping, and inspect all penetrations for reinforcement, sealing with ties, and an epoxy finish.
  • **Inspect the pumps.** Pull and reinstall each pump to check the ease of removal, rail alignment, and disconnect flange tightness. Check the pump paint, cable and routing, interior lining, mechanical piping paint, and discharge piping alignment. Verify the pressure gauges, hatch opening, and required signage.
  • **Inspect the valve vault and piping.** Verify the drainage line at ground level between the vault and the well, the discharge piping alignment between the well and vault, and that seals are sealed with compound. Check the pump motor cable continuity, stainless steel cable ties, bubbler line sealing, and penetration sealing in the conduit.
  • **Inspect the electrical system and control panel.** Verify the signed electrical inspection report, accessible ground rods with risers, the wiring diagram in the door pocket, and that the control side of the panel faces the pump well. Check UL labelling, enclosure condition, thickness against specifications, indicator lamps, wire identification, nameplates, and debris removal. Perform an operational test of the controls.
  • **Inspect the telemetry system.** Visually confirm all components are provided and pre-wired, including the radio, antenna, associated wiring, and alarm points. Verify the communication link with the base station, inspect the field wiring, and confirm the standard mast and antenna are provided with the standard anchoring method.
  • **Perform the operational tests.** Conduct the pumping system operational test by verifying pump rotation, adjusting valves during main line filling if applicable, performing a draw-down test to calculate actual GPM and compare it to design specifications for both pumps, and adding water or simulating flow to confirm the liquid level control system. Then perform the generator operational test.
  • **Verify contractors are present at start-up.** Ensure the contractor and its representatives, including the electrician, control panel manufacturer, pump manufacturer, and mechanic, are present. The generator manufacturer is optional.

Start inspecting smarter — free for one user.

What this checklist is for

A pump maintenance inspection checklist is a tool used by technicians and engineers when inspecting pumps and pump stations. It guides you through a structured inspection so you can confirm that the pumps are in good working condition and identify issues before they cause unplanned disruptions. The checklist covers the full station, from the site and grounds through the pump well, pumps, valve vault, piping, electrical system, control panel, and telemetry system, and it ends with operational tests of the pumping system and generator.

Why pump maintenance matters

Pump stations keep water and wastewater moving. When a pump fails, the disruption can be costly and can affect the community or process it serves. Regular inspection helps you find and correct problems such as poor drainage, damaged coatings, misaligned piping, loose connections, or faulty controls. The checklist's operational tests, including draw-down testing to calculate actual GPM and compare it to design specifications, confirm that the station performs as intended under working conditions.

What a good pump maintenance inspection covers

A thorough inspection covers the whole station rather than just the pump itself. The checklist is organised into sections so you can work through it systematically: - **Site and grounds** – drainage, paving, fences and gates, and access. - **Pump well** – interior lining, exterior coating, penetrations, bolting, hatch, signage, and levels. - **Pumps** – removal and reinstallation, rail alignment, paint condition, cable routing, and gauges. - **Valve vault** – drainage, discharge piping alignment, seals, and cable ties. - **Piping** – alignment, paint, and material checks. - **Electrical** – reports, grounding, labelling, and wiring. - **Control panel** – enclosure condition, thickness, lamps, nameplates, and control operation. - **Telemetry system** – components, communication link, and field wiring. - **Operational tests** – pumping system performance and generator operation.

Regulations and standards

The checklist references OSHA signage and UL labelling, and it asks for a signed electrical inspection report. Where these apply to your site, follow the requirements that govern your installation. The checklist does not replace the approved design and specifications; use them as the reference for the items it asks you to verify.

How to carry out the inspection

Work through the checklist section by section. Start with the site and grounds, then move through the pumping station in a logical order. Record each item using the answer scale: **Safe**, **At risk**, or **N/A**. For items that require measurement or testing, such as the control panel enclosure thickness or the draw-down test, record the results and compare them to the design specifications. Note any defects you find so they can be corrected before they affect operation.

Using this checklist

This checklist is a ready-to-use template for pump maintenance inspections. You can use it as written or adapt the sections to the specific pumps and station configuration you are responsible for. It is designed to be practical in the field, so you can move through the items efficiently and keep a clear record of the inspection.

Frequently Asked Questions

You can carry out the inspection in phases, working through the checklist section by section. Begin by inspecting the site and grounds, then move to the well and pump well, the pumps, valve vault, piping, electrical, and control panel. Finish with a telemetry check and the operational tests for the pumping system and generator. Use the checklist's structure, and record each item as Safe, At risk, or N/A as you go.

The checklist covers the whole pumping station rather than the pump alone. It includes the site and grounds, the pump well, the pumps, the valve vault, the piping, the electrical system, the control panel, the telemetry system, and operational tests of the pumping system and the generator. This means an inspection spans civil, mechanical, and electrical elements in one pass.

Inspecting a pump station involves asking about the site and grounds, the pump well, the pumps, the valve vault, the piping, the electrical system, the control panel, and the telemetry system, plus operational tests of the pumping system and generator. Each section asks you to inspect, verify, or test specific elements, such as drainage, structure ties, pipe alignment, pump removal and reinstallation, cable routing, panel identification, and flow testing.

The checklist helps you find problems before they interrupt the station. By inspecting drainage, grounds, fences, penetrations, piping alignment, electrical grounding, panel components, and telemetry, and by performing draw-down and operational tests, you can identify issues that would otherwise cause unplanned disruptions. The intention is to confirm the pumps are in good working condition.

The checklist addresses submersible pumps, their cables, float and bubbler controls, discharge piping, the valve vault with pumps and gauges, and control panels with telemetry and generator back-up. This covers the common configuration of a municipal or industrial pump station where reliability and pump performance matter. If your station differs, you can adapt the sections to the types of pumps you operate.

The operational test includes draw-down testing to calculate the actual GPM and compare it to design specifications, checking both pumps. It also covers adding water and simulating flow to confirm the liquid level control system, verifying pump rotation, adjusting valves during main line filling if applicable, and running a generator test. These tests verify that the pumping system meets its design performance under working conditions.

The checklist asks you to verify that all required signage is in place, including Confined Space and OSHA signage, and that ground rods are accessible with risers installed to reach them. It also asks for a signed electrical inspection report, including one from the chief electrical facilities inspector, and for a wiring diagram to be present. These items support a safe and compliant installation.

Yes. The checklist includes a site and grounds section covering drainage, paving, fences and gates, and pump wells. It works through pumps in detail, covering removal and reinstallation, rail alignment, disconnect flange tightness, paint condition, and cable routing. It also inspects the valve vault, piping alignment, electrical and control panel, telemetry communication with the base station, and finishes with operational tests. You can follow sections in order or adapt them to your inspection route.
Arne Reis
Written by
Arne Reis
Founder

Process optimizer with 25 years of expertise, focused on operational excellence in quality, maintenance, EHS, and commissioning. Emphasizes innovative solutions and top-quality standards.

View LinkedIn profile

Still managing operations with paper and Excel?

Digitize inspections, audits, SOPs, and corrective actions.

Book A Personal Demo
flowdit mobile inspection app

Ready to simplify inspections and get your team moving faster?

Start free today and turn inspections into a clear, consistent digital workflow. Prefer a guided walkthrough? Book a demo and see how flowdit can fit your team.