Preventive Maintenance Checklist
Utilize this checklist to thoroughly inspect engraving and stripping machines.
Use this template with flowdit
- Customize this template or build your own
- Complete inspections using the mobile app
- Get reports and analyze your data
Start inspecting smarter — free for one user.
How to Use This Checklist
- Record the inspection date, who prepared it, and the location.
- Work through the critical components — assess all motors, check the Hollmuller, Assomma, and chemical pumps, and inspect the conveyor rollers and chain.
- Check the piping system for leaks, including CDA piping, and inspect the spray nozzle, replacing it if damaged and confirming it is properly repaired.
- Inspect all filters and screens, check the air scrubber ducts, and inspect the rinsing filter, replacing it if corroded.
- Verify the settings in the main control box, check the water distribution system, and replace any malfunctioning oscillator.
- Confirm no leaks are detected after any repair.
- Complete the administrative fields — signature, real start and end times, and finished at.
Start inspecting smarter — free for one user.
What preventive maintenance is and why it matters
Preventive maintenance is the routine inspection and servicing of equipment before faults turn into failures. Rather than waiting for an engraving or stripping machine to break down and repairing it after the fact, you inspect components on a defined schedule, replace parts that show wear or damage, and confirm that repairs have held. This checklist supports that work by giving you a structured pass through the equipment: critical components first, then non-critical components and the surrounding systems. The value of the approach is that it moves maintenance from reactive to planned. A damaged spray nozzle, a corroded rinsing filter, or a malfunctioning oscillator are all easier to address when you find them during an inspection than when they stop production. Checking them together, on a consistent schedule, is what makes the difference.
What the checklist covers
The checklist is organised into sections that separate the equipment you cannot afford to miss from the equipment that can wait. The sections are: - **Critical Components** — the core machinery, including motors, pumps, and the conveyor system. - **Non-Critical Components** — supporting parts and systems that are still worth inspecting but are less production-critical. - **Motors** — a functional assessment of all motors. - **Pumps** — condition checks for all Hollmuller pumps, all Assomma pumps, and all chemical pumps. - **Conveyor System** — inspection of conveyor rollers and chain. - **Piping System** — leak checks throughout the piping, plus a specific inspection of CDA piping. - **Spray Nozzle** — replacement if damaged, and confirmation that the replacement was properly repaired. - **Filters or Screens** — inspection of all filters and screens. - **Main Control Box** — verification of the settings shown in the control box. - **Oscillators** — replacement if an oscillator is malfunctioning. There are 23 items in total, covering both the physical inspection and the administrative record of who inspected, where, and when.
How to carry out the inspection
Start with the administrative details: record the date the inspection was conducted, who prepared it, and the location. This establishes a record you can refer back to and compare against future inspections. Work through the critical components first. Assess the functionality of all motors, then check the condition of all Hollmuller, Assomma, and chemical pumps. Inspect the status of the conveyor rollers and chain. Where you find a fault, address it: replace a damaged spray nozzle and confirm it has been properly repaired, and replace a malfunctioning oscillator. Move through the piping system checking for leaks, including the CDA piping. Inspect all filters and screens, check the air scrubber ducts, and inspect the rinsing filter, replacing it if it is corroded. Verify the settings indicated in the control box and check the water distribution system. After any repair, confirm that no leaks are detected. Finish by signing the checklist and recording the real start and end dates and the finished time. For each item you complete with no issues, mark it as **Completed - No issues found**. For anything still to be examined, mark it as **Pending inspection**. This keeps the outstanding work visible so it is not lost between inspections.
Who uses this checklist
This checklist is for maintenance technicians and supervisors working with engraving and stripping machines. It is also useful for the person responsible for scheduling maintenance, because the recorded inspection dates and times show when the equipment was last reviewed and what was found. If a component was left as **Pending inspection**, that flag tells you a follow-up is still required before the equipment can be considered fully reviewed.
Frequently Asked Questions
Ready to simplify inspections and get your team moving faster?
Start free today and turn inspections into a clear, consistent digital workflow. Prefer a guided walkthrough? Book a demo and see how flowdit can fit your team.