Business Category: Maintenance / Industrial Category: Manufacturing

Factory Shift Start Inspection

Checklist for conducting a thorough inspection at the start of each factory shift to ensure optimal operating conditions and equipment functionality.

Use this template with flowdit

  • Customize this template or build your own
  • Complete inspections using the mobile app
  • Get reports and analyze your data

Start inspecting smarter — free for one user.

Factory Shift Start Inspection
Based on

How to Use This Checklist

  • **Record the inspection details first.** Enter the date the inspection is conducted, note who prepared it and the location, and read the inspection instructions before starting. These details set the context for every result that follows.
  • **Work through the two sections in order.** The inspection is organised into **Tapes** and **Pumps**, with a large number of checks in each. Follow the sequence so no unit is missed.
  • **Check each machine by number.** For every unit listed — M80, M38, M34, M26, M74, M32, M31, M71, M30, M73, M23, M5A, M5, M6, M7, M8, M2, M3 South and M4 — inspect the **bearings**, the **belt** and the **transmission**.
  • **Record a Pass or Fail for each item.** When a bearing, belt or transmission does not meet its operating condition, mark it **Fail** and note what you observed so the issue can be addressed.
  • **Do this at the start of every shift.** Repeat the full inspection before the factory line begins running, so equipment is confirmed as ready before it is put to work.

Start inspecting smarter — free for one user.

What the factory shift start inspection covers

The factory shift start inspection is a structured check of the machinery that is about to run, carried out at the beginning of each shift. The main sections of the inspection are **tapes** and **pumps**, and the checks are split out machine by machine so each unit is examined individually. Each unit is inspected across three components: - **Bearings** - **Belt** - **Transmission** The units listed in this inspection are M80, M38, M34, M26, M74, M32, M31, M71, M30, M73, M23, M5A, M5, M6, M7, M8, M2, M3 South and M4. Before the machine checks begin, the inspection records the date it was conducted, who prepared it, the location and the relevant inspection instructions. Every check is answered on a **Pass/Fail** scale. A pass means the condition is acceptable; a fail records a component that is not in a suitable operating state and needs attention.

Why it matters

Inspecting at the start of a shift, before the line begins running, gives you the chance to catch a faulty bearing, a worn belt or a transmission problem while the equipment is stationary. That is safer and simpler than discovering it once the machine is in production. A consistent start-of-shift check also gives every shift the same baseline. When the same machines are checked in the same order and the results are recorded as Pass or Fail, a fault is visible in the record rather than only in someone's memory, and it is easier to hand over between shifts. Because bearings, belts and transmissions are checked on every listed unit, a pattern of fails on a particular component or machine can be seen in the inspection record itself.

What to record

For each machine, record the result of the bearings, belt and transmission checks. Use the Pass/Fail scale consistently and add detail where a check fails, so the person carrying out the repair knows which component and which machine is affected. The inspection also captures the date, the person who prepared it and the location, which together identify when and where the check took place.

Using the checklist

The factory shift start inspection checklist is the tool that keeps this work in a fixed order. It lists every unit and every component to be checked, provides the Pass/Fail answers for each item, and captures the conducting date, preparer and location so each shift's inspection is recorded against the right machine lineup. Work through it at the start of each shift, before the machinery is put into operation.

Frequently Asked Questions

Conduct it at the start of every shift, before equipment runs. Confirm when and where the inspection is taking place and who is carrying it out, then walk the lines and check each machine.

The inspection lists each unit by name. The M80, M38, M34, M26, M74, M32, M31, M71, M30, M73, M23, M5A, M5, M6, M7, M8, M2, M3 South and M4 units are included.

Each machine is checked in three categories: bearings, belt and transmission. The main sections of the shift start inspection are tapes and pumps.

Yes. The answer scale for each item is Pass or Fail, so an operating condition or component is recorded as either passing or failing.
Arne Reis
Written by
Arne Reis
Founder

Process optimizer with 25 years of expertise, focused on operational excellence in quality, maintenance, EHS, and commissioning. Emphasizes innovative solutions and top-quality standards.

View LinkedIn profile

Still managing operations with paper and Excel?

Digitize inspections, audits, SOPs, and corrective actions.

Book A Personal Demo
flowdit mobile inspection app

Ready to simplify inspections and get your team moving faster?

Start free today and turn inspections into a clear, consistent digital workflow. Prefer a guided walkthrough? Book a demo and see how flowdit can fit your team.