Building Maintenance Template
Use this checklist to perform routine preventive maintenance and safeguard the building's roofing, lighting systems, HVAC equipment, and plumbing infrastructure.
Use this template with flowdit
- Customize this template or build your own
- Complete inspections using the mobile app
- Get reports and analyze your data
Start inspecting smarter — free for one user.
How to Use This Checklist
- **Set the context.** Record the date, who prepared the inspection, and the location at the top of the form.
- **Read the guidance section before each area.** Inspection, Planning, and related guidance sections sit at the start of their block and describe how to approach the items that follow.
- **Work through one system at a time.** Roofing System, HVAC System, Plumbing and Restrooms, and Lighting Systems are separated so you can walk a system fully before moving on.
- **Answer each item on the Yes/No/N/A scale.** Choose 'N/A' where a feature or system is not present at the building, such as a green roof, rooftop solar array, cooling tower, or economizer.
- **Follow the walk-and-check prompts.** Items such as walking the perimeter to examine sheet metal flashing, copings, and previously repaired sections, or removing cooling tower screens and access panels for internal inspection, describe the physical action expected.
- **Record measurements and observations.** Where an item asks for readings, such as superheat temperature or Megger test results, capture the figures and any supporting observations.
- **Note who carries out specialised work.** Items flag where a qualified mechanical contractor or licensed contractor should be engaged rather than handling the task in-house.
- **Close out the inspection.** Note the real start and end dates, record the finished time, and sign the form.
- **Feed results into planning.** Use the Long-Term Maintenance Items section to document major equipment service life cycles and projected replacement dates, and to track warranties and service contract renewal or expiration dates.
Start inspecting smarter — free for one user.
What building maintenance inspection is
Building maintenance inspection is the routine, walk-through process of checking the physical systems of a building against a defined set of maintenance items, recording the condition of each one, and acting on what you find. It is preventive by design: instead of waiting for a roof leak, a failed pump, or a dark corridor to force a repair, you look for the early signs of wear and address them on your own schedule. This checklist organises that work into a Building Maintenance Audit covering the roofing system, the HVAC system, plumbing and restrooms, lighting systems, and long-term maintenance items. Each item is answered on a simple Yes/No/N/A scale, so the form produces a consistent record of what was checked and what condition it was found in.
Why it matters
Maintenance activity that is not written down tends to go unproven and unrepeated. A structured checklist gives you three things. - **A defensible record.** Answers, measurements, and observations accumulate into a maintenance history you can return to instead of relying on memory. - **Earlier detection.** Items target the conditions that precede failure: wrinkles, tears, or separations in flashings; corrosion on metal roof panels; missing screws, latches, gaskets, or bolts; leaks at fixtures; pitting on electrical contacts. - **Better long-term decisions.** The checklist asks you to document equipment service life cycles, project replacement dates, and track warranty and service contract dates so renewals and expirations do not pass unnoticed. Spent lighting components, which may contain mercury or lead, are tracked to a certified disposal provider with documentation showing the waste went to recycling rather than landfill.
What a good inspection covers
A complete walk-through touches each building system and the records that support it. **Roofing system** - Roof maintenance file and current roof warranty information. - Roof drains, scuppers, and gutters clear of debris and functioning. - Sheet metal flashing, copings, and previously repaired sections, examined by walking the perimeter. - Wrinkles, tears, or separations in roof-to-wall connections, base flashings, curb flashings, and penetration flashings. - Corrosion on metal roof panels, which may be caused by condensate from copper coils in rooftop HVAC units. - Control of unnecessary foot traffic to prevent damage to the roofing membrane. - If a green roof is present: plant health and weeding, and adequate irrigation to sustain vegetation and protect the membrane against leaks and water pooling. - A moisture survey plan conducted every five years to detect wet insulation or hidden leaks. - If rooftop solar panels are present: panels detaching or loosening under ice, snow, or wind; the condition of mounting racks and the areas around roof penetrations; and ballasted support systems installed on protective pads. **HVAC system** - Access panels and cabinet doors checked for missing screws, latches, gaskets, or bolts. - Condensate drain pans with recharged P-traps or primed U-traps. - Seasonal preventive maintenance on chillers and boilers performed by a qualified mechanical contractor. - Cooling towers: screens and access panels removed for internal inspection; fill, support structure, sump basin, and spray nozzles checked for wear, scale, and biological growth; fill valve, gear box, drive coupling, fan blades, and motor bearings inspected and serviced; motor starter and control cabinet cleaned of dust and debris. - Wiring connections inspected, starter contacts checked for wear and correct operation, and a Megger test performed on the motor with readings recorded. - Sump heater and its switch verified, with observations documented. - Pump bearing lubrication completed at least annually, couplings inspected for leaks, and unusual noises investigated. - Air handling unit filters cleaned or replaced at least monthly, with some filter types needing replacement only every three to six months depending on type and environment. - Condenser coil cleaned with coil cleaner and thoroughly rinsed, engaging a licensed contractor if panel removal is required for access. - Operating parameters inspected for energy efficiency, particularly compressor performance, refrigerant charge levels, and thermal expansion valve operation where applicable. - Superheat temperature within the range of 10 to 20 degrees F for direct expansion systems, determined from manufacturer data using measured suction line pressure and actual suction line temperature. - If an economizer is fitted: dampers checked for corrosion or debris obstruction; actuators, linkages, and seals inspected; sensors calibrated at least annually. **Plumbing and restrooms** - Circulation pump and domestic water booster system bearings lubricated at least annually, and couplings inspected for leaks. - Water heaters and domestic boilers periodically fire-tested, with a combustion gas analysis to optimise combustion draft and combustion air intake for peak efficiency. - Remote water cooler condenser fan motor bearings lubricated annually. - Electrical contacts inspected for wear and pitting, and system control tests performed. - The system pumped down and refrigerant removed in accordance with manufacturer instructions for service. - Compressor oil reservoir drained and refilled with new oil, including replacement of filters, strainers, and traps. - Sump and sewage ejector pumps tested for proper operation, with exposed pumps lubricated annually. - Fixtures, especially those in public restrooms subject to heavy use, inspected for leaks, with internal mechanisms such as flappers, cartridges, and diaphragms replaced per manufacturer-recommended intervals. **Lighting systems** - Luminaires with transformers, control gear, or accessories such as spread lenses, glare baffles, or colour filters routinely inspected for proper function. - Exterior fixtures checked for intact cables, all fasteners and hardware in place and secure, and gaskets replaced to maintain a weather-tight seal. - Burned-out lamps replaced, with group relamping considered and scheduled based on calculated lamp life and usage patterns. - Consistent colour temperature across lamps within each fixture or space for uniform lighting appearance. - Adjustable or programmable fixtures re-aimed or recalibrated as needed. - Lamps dusted and lens surfaces cleaned to maintain illumination levels. - Spent bulbs, which may contain mercury or lead, stored safely until collected by a certified disposal provider, with documentation maintained to verify recycling rather than landfill disposal. **Long-term maintenance items** - Major equipment service life cycles documented and projected replacement dates scheduled. - All equipment warranties and service contracts tracked, with renewal or expiration dates recorded.
How to carry out the inspection
1. **Prepare before you walk.** Confirm the roof maintenance file exists and is current, and that roof warranty information has been reviewed. Gather manufacturer data for equipment where readings will be taken. 2. **Walk the building system by system.** Move through roofing, HVAC, plumbing and restrooms, and lighting in turn, following the guidance note at the start of each block. 3. **Inspect physically where the item requires it.** Walk the perimeter to examine sheet metal flashing, copings, and previously repaired sections. Remove cooling tower screens and access panels for internal inspection. Check economizer dampers for corrosion or debris obstruction. 4. **Take and record measurements.** Where an item calls for a figure, such as superheat temperature or Megger test readings, write down the result and the conditions it was taken under. 5. **Document observations.** Several items ask for findings to be recorded, including the condition of the sump heater and its switch and any unusual noises from pump couplings. 6. **Know when to call a contractor.** Engage a qualified mechanical contractor for seasonal preventive maintenance on chillers and boilers, and a licensed contractor where condenser coil access requires panel removal. 7. **Handle waste correctly.** Store spent lamps safely until a certified disposal provider collects them, and keep the documentation that verifies recycling rather than landfill disposal. 8. **Close out and sign.** Record the real start and end dates, note the finished time, and sign the completed inspection. 9. **Plan forward.** Use the long-term items to schedule projected equipment replacements and to track warranty and service contract renewal or expiration dates, and keep the moisture survey plan on its five-year cycle.